• img.alt
    Lafarge Group
    Your machine is highly quality, we are happy with your machine quality
  • img.alt
    CRCC
    The after service is very good, everytime they can help us solve that as soon as possible
  • img.alt
    Communications Construction
    Good factory, and the salesmanager very reponsibility
Contact Person : Vivi An
Phone Number : +86 18595885369
WhatsApp : +8618595885369

Light Weight Aggregate Drum Js1500 90m3/H Concrete Mixer Machine

Place of Origin China
Brand Name CinaCharm
Certification CE;ISO;BV;SGS
Model Number JS1500
Minimum Order Quantity Negotiable
Price Negotiable
Product Details
Name Twin Shaft Concrete Mixer Model JS1500
Material Q235 Motor Power 2*37 Kw
Discharge Way Pneumatic Or Hydraulic Reclaiming Capacity 350L, 3.5 Cubic Feet, 4000 L, 40KG, 270L
Charging Capacity 560L, 1600L, 3.5 Cubic Feet, 650, 5300 L Motor Power 2.2kw, 5.5kw, 16HP, 1/2 HP, 375W
High Light

90m3/H Concrete Mixer Machine

,

Js1500 Concrete Mixer Machine

,

90m3/H js1500 concrete mixer

Leave a Message
Product Description

automatic twin shaf ready light weight aggregate drum mix concrete mixer js1500 concrete mixer

 

Main Features
1) The structure of the mixer is reasonably and compactly, which can save space and be installed&replaced easily
2) Combined double floating seal and unique seal with high pressure grease, which can make it a longer service life;
3) The mixing arms are streamline in axial and in radial direction which ensures fast mixing speed and can reach to the homogeneity quickly. Meanwhile, the unique designed structure can improve the utilization rate of cement;
4) Scale board and paddle are made of manganese steel, which can increase the service life;
5) High pressure cleaning device, consistence probe are optional.

Light Weight Aggregate Drum Js1500 90m3/H Concrete Mixer Machine 0

Advantages of our JS concrete mixer

1) Twin-shaft JS500 concrete mixer mixing system consists of motor, pulley, gearbox, gear, stirring device, mixing drum and other components. The main motor is connected to the secondary gear reduction box through a belt, and finally the two horizontally-connected stirring shafts are respectively rotated by the two pairs of open gears at the same speed.

 

2)When the Twin-shaft JS500 concrete mixer is in the fed process, the mixture to be mixed is placed in the hopper, the feeding system is started, and the wire rope pulling hopper is climbed upward. When climbing to a certain height, the hopper enters the feeding rack, the door is automatically opened, and the material is discharged into the mixing drum through the funnel.

 

3)The discharging system is located at the bottom of the Twin-shaft JS500 concrete mixer and is unloaded by a manual push rod.

According to customer requirements, the mixer can be produced in the form of electric push rod discharge.

The connection between the discharge door and the mixing drum is sealed with a sealing plate, and the position of the sealing plate can be adjusted to ensure the purpose of sealing.

 

4) The electrical control system needs to control the main drive motor of the Twin-shaft JS500 concrete mixer, the motor of the water supply system, the feeding and unloading of the motor. All electrical control components are located in the distribution box. The electrical components in the distribution box are installed on an iron plate, which is safe and reliable, and convenient for operation and maintenance.

Light Weight Aggregate Drum Js1500 90m3/H Concrete Mixer Machine 1

Parameters:

Model JS1000 JS1500 JS2000 JS3000 JS4000
Discharging capacity 1000L 1500L 2000L 3000L 4000L
Charging capacity 1600L 2250L 3000L 4500L 6000L
Productivity ≥60m3/h ≥90m3/h ≥120m3/h ≥180m3/h ≥240m3/h
Maximum size of Aggregate (mm) <60/80 <40/60 <80/100 <80/100 <80/100mm
Mixing blade Speed of mixing drum 32r/min 30r/min 25r/min 22r/min 20r/min
Quantity 2×7 2×8 2×8 2×9 2x10
Mixing motor
 
Model Y180M-4 Y180-4 Y200L-4 Y225S-43 Y250M-4
Power 2X18.5kw 2X30kw 2X37kw 2X55kw 2X75
Total Weight kg 5200 5800 7500 9200 12200
 

 

FAQ:

1, How about warranty?
12 months after successfully installation. Life long technical support.

 

2, What certificate do you have?
ISO 9001 and GOST.

 

3, How about delivery time?
1-40 days after order confirmed, exact time on the base of order quantity, product type and peak/low season.

 

4, What is the payment terms?
30% T/T deposit and 70% T/T balance before shipment or 100% L/C at sight.

 

5, How about your after-sales service?
24 hours technical support and solution Free spare parts during waranty period and cost price parts beyond warranty

 

6, How can I get a quote?
Please feel free to contact us by email, phone, whatsapp, wechat or skype, we will feedback within 24 hours.

 

7, Can I visit your factory?
Your visiting will be warmly welcomed. Xinzheng International Airport in Zhengzhou is 60km away our facotry. Zhengzhou East Railway Station is 20km away our factory. Lots of flights and high speed trains from all China to our city.

 

welcome to visit our factory!